REVISED CCNA COURSE CONTENTS

February 03, 2011
                  
 INTERCONNECTING CISCO NETWORK DEVICES

INTRODUCTION


Course Acronym: ICND (640 – 801)                Course Duration: 40 Hours

Course Content:

·         Concepts and commands required to configure Cisco switches and multiprotocol internetworks.
·         Demonstrations, exercises, and laboratory projects to identify and recommend the best Cisco solutions.
·         Basic configuration procedures to build a multirouter, multigroup internetwork that uses LAN and WAN interfaces for the most commonly used routing and routed protocols.
·         Installation, configuration, and troubleshooting information that technical support people required to install and configure Cisco products.

Who Should Attend:              

·         Network Administrators responsible for implementing and managing small & medium business networks.
·         Customers or channel sellers new to Cisco products or to internetworking industry.
·         Network support staff who will act as network device installers & first-line support.
·         Network technicians new to Cisco products and services.
·         CCNA candidate
·         CCNP candidate

Content by Module:

·         Module 1: Getting Started with Cisco Networks
·         Chapter1: Course Introduction
·         Chapter 2: Selecting Cisco Network Devices
·         Chapter 3: Assembling and Cabling Cisco Network Devices
·         Chapter 4: Operating and Configuring a Cisco IOS Devices
·         Chapter5: Managing Your Network Environment
·         Module 2: Interconnecting Cisco Switches
·         Chapter 6: Catalyst Switch operations
·         Chapter 7: Extending Switch Functionality
·         Module 3: Interconnecting Cisco Routers
·         Chapter 8: Configuring IP Addressing
·         Chapter 9: Adding Basic IP Routing Protocols
·         Chapter 10: Basic IP Traffic Management with Access Lists
·         Chapter 11: Configuring Novell IPX
·         Module 4: Extending the Network to WAN
·         Chapter 12: Establishing Serial Point-to-Point Connections
·         Chapter 13: Completing an ISDN BRI Call
·         Chapter 14: Establishing a Frame Relay PVC Connection
·         Module 5: Solving Network Problems
·         Chapter 15: Solving basic Network Problems

REVISED CCNA COURSE CONTENTS

 

NAT     :     NETWORK ADDRESS TRANSLATION


PAT      :     PORT ADDRESS TRANSLATION

EIGRP:      EXTENDED INTERIOR GATEWAY ROUTING PROTOCOL

OSPF    :      OPEN SHORTEST PATH FIRST

VLSM:       VARIABLE LENGTH SUBNET MASKS

Related Posts

Next Article
« Prev Post
Previous Article
Next Post »

2 comments

For CCNA exams, you should be acquainted with the interface of the exam and exam’s nature.

Balas